Project gains EU support

  1. Testing of multi-standard rapid charge points

    The rapid charge points have been tested and approved.

  2. Site surveys begin

    Work began at the first identified locations.

  3. First Charge point installed

    The first official Rapid Charge Network point was installed.

  4. Project officially launched in Corley

    With ten charge points installed, the project officially launched.

  5. Charge point no. 20 installed

    By the month of October the project had installed 20 charge points.

  6. EV drivers wanted

    EV drivers are encouraged to take part in the RCN study.

  7. Baseline data report

    Existing EV driver data will be analysed to provide a baseline for the project.

  8. Data loggers installed

    Over 40 vehicles fitted with data loggers as part of the project’s study.

  9. Study and business case developed

    The strategy documents will be made available at the project closure event.